← Backflow review queue
Backflow assembly test · 3379 Cedar Hollow Ct
ApprovedFiled Sep 12, 2024 by Logan Ramirez, Ridge Plumbing & Backflow · filed from phone
Report
- Date of service
- Sep 12, 2024
- Assembly type
- RP
- Serial number
- B908178
- Size
- 3/4
- Test gauge serial
- G-2693
- Gauge calibration date
- Jun 27, 2024
- Check valve 1
- 5.9 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.6 psid
- Relief valve opened at
- 3.9 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 001-31-01063
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
3379 Cedar Hollow Ct
Owner: Morgan Pruitt
Parcel 001-31-01063