← Backflow review queue
Backflow assembly test · Crossroads Apartments
ApprovedFiled Dec 18, 2025 by Jamie Hollins, Clearwater Backflow Testing · filed from phone
Report
- Date of service
- Dec 18, 2025
- Assembly type
- RP
- Serial number
- A591904
- Size
- 1 1/2
- Test gauge serial
- G-9265
- Gauge calibration date
- May 9, 2025
- Check valve 1
- 6 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.3 psid
- Relief valve opened at
- 2.5 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 091-29-01069
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
1808 Laurel Ct
Owner: Ramirez Holdings LLC
Parcel 091-29-01069