← Backflow review queue
Backflow assembly test · Crossroads Taqueria
ApprovedFiled Jul 11, 2026 by Jamie Hollins, Clearwater Backflow Testing · filed from phone
Report
- Date of service
- Jul 11, 2026
- Assembly type
- RP
- Serial number
- Z518830
- Size
- 1 1/2
- Test gauge serial
- G-4574
- Gauge calibration date
- May 22, 2026
- Check valve 1
- 4.2 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.3 psid
- Relief valve opened at
- 1.4 psid
- Result
- Repaired and passed
- Repairs made
- Replaced check valve 1 rubber
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 091-80-01286
- RP relief valve must open at 2.0 psid or more.
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
2376 Stone Gate Way
Owner: Ellery Holdings LLC
Parcel 091-80-01286