← Backflow review queue
Backflow assembly test · Blue Heron Diner
ApprovedFiled Sep 28, 2024 by Hayden Ramirez, Patriot Backflow Testing · paper form read in and confirmed by staff
Report
- Date of service
- Sep 28, 2024
- Assembly type
- RP
- Serial number
- W980831
- Size
- 1
- Test gauge serial
- G-7068
- Gauge calibration date
- Jun 29, 2024
- Check valve 1
- 5.4 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.3 psid
- Relief valve opened at
- 3.7 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 069-16-01277
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
100 Spring Branch Ct
Owner: Harlow Holdings LLC
Parcel 069-16-01277