← Backflow review queue
Backflow assembly test · Corner Apartments
ApprovedFiled Sep 30, 2026 by Rowan Pruitt, Summit Backflow Testing · filed from phone
Report
- Date of service
- Sep 30, 2026
- Assembly type
- RP
- Serial number
- B909925
- Size
- 4
- Test gauge serial
- G-6698
- Gauge calibration date
- Feb 6, 2026
- Check valve 1
- 7.5 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.8 psid
- Relief valve opened at
- 2.6 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 041-45-01070
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by Auto-approved (no flags). The property's next due date is set and the owner gets a receipt.
Property
9239 Spring Branch Dr
Owner: Vance Holdings LLC
Parcel 041-45-01070