← Backflow review queue
Backflow assembly test · 7621 Quarry Way
ApprovedFiled Dec 21, 2024 by Alex Danner, Keystone Plumbing & Backflow · filed from phone
Report
- Date of service
- Dec 21, 2024
- Assembly type
- RP
- Serial number
- Z499375
- Size
- 3/4
- Test gauge serial
- G-3698
- Gauge calibration date
- Aug 17, 2024
- Check valve 1
- 6.8 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.6 psid
- Relief valve opened at
- 2.3 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 041-29-01180
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
7621 Quarry Way
Owner: Taylor Vance
Parcel 041-29-01180