← Backflow review queue
Backflow assembly test · 3755 Pine Knoll Dr
ApprovedFiled Jun 8, 2026 by Drew Fairley, Evergreen Backflow Testing · paper form read in and confirmed by staff
Report
- Date of service
- Jun 8, 2026
- Assembly type
- DC
- Serial number
- A350379
- Size
- 3/4
- Test gauge serial
- G-5462
- Gauge calibration date
- Dec 28, 2025
- Check valve 1
- 7.1 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.8 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 013-45-01065
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by Auto-approved (no flags). The property's next due date is set and the owner gets a receipt.
Property
3755 Pine Knoll Dr
Owner: Blake Wexler
Parcel 013-45-01065