← Backflow review queue
Backflow assembly test · Golden Pizza
ApprovedFiled May 3, 2026 by Casey Kessler, Northstar Plumbing & Backflow · filed from phone
Report
- Date of service
- May 3, 2026
- Assembly type
- DC
- Serial number
- W619798
- Size
- 1
- Test gauge serial
- G-9634
- Gauge calibration date
- Jan 10, 2025
- Check valve 1
- 0.3 psid
- Check valve 1 closed tight
- No
- Check valve 2
- 1.1 psid
- Result
- Fail
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 005-23-01036
- Test gauge calibration is more than a year old.
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
466 Meadow Lark Trl
Owner: Ramirez Holdings LLC
Parcel 005-23-01036