← Backflow review queue
Backflow assembly test · 1291 Cedar Hollow Trl
ApprovedFiled Mar 8, 2025 by Sam Vance, Ridge Backflow Testing · filed from phone
Report
- Date of service
- Mar 8, 2025
- Assembly type
- PVB
- Serial number
- Z702972
- Size
- 1
- Test gauge serial
- G-9682
- Gauge calibration date
- Jun 13, 2024
- Check valve 1
- 8.4 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3.5 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 079-55-01179
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
1291 Cedar Hollow Trl
Owner: Casey Fairley
Parcel 079-55-01179