← Backflow review queue
Backflow assembly test · Main Street Animal Hospital
ApprovedFiled Nov 9, 2023 by Sam Vance, Ridge Backflow Testing · filed from phone
Report
- Date of service
- Nov 9, 2023
- Assembly type
- RP
- Serial number
- W234012
- Size
- 4
- Test gauge serial
- G-4492
- Gauge calibration date
- Aug 18, 2023
- Check valve 1
- 4.9 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.2 psid
- Relief valve opened at
- 3.1 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 079-98-01116
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
9898 Spring Branch Ln
Owner: Nguyen Holdings LLC
Parcel 079-98-01116