← Stormwater review queue
Stormwater facility inspection · Main Street Grill
ApprovedFiled Jul 5, 2026 by Taylor Vance, Keystone Engineering · paper form read in and confirmed by staff
Report
- Date of service
- Jul 5, 2026
- Facility type
- Dry pond
- Sediment accumulation
- 66 % of capacity
- Inlet and outlet clear
- Yes
- Erosion or embankment damage
- Yes
- Vegetation maintained
- Yes
- Maintenance needed
- Remove sediment at forebay; clear outlet trash rack
- Functioning as designed
- No
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for professional engineer
- All required fields present
- Address matches parcel 059-89-01241
- Sediment over 50% of capacity: cleanout needed.
- Erosion or embankment damage reported.
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
5403 Spring Branch Dr
Owner: Ramirez Holdings LLC
Parcel 059-89-01241