← Backflow review queue
Backflow assembly test · Golden Animal Hospital
ApprovedFiled Jul 19, 2025 by Cameron Ellery, Northstar Plumbing & Backflow · filed from phone
Report
- Date of service
- Jul 19, 2025
- Assembly type
- RP
- Serial number
- A561165
- Size
- 1
- Test gauge serial
- G-1305
- Gauge calibration date
- May 13, 2024
- Check valve 1
- 0 psid
- Check valve 1 closed tight
- No
- Check valve 2
- 3.6 psid
- Relief valve opened at
- 3.5 psid
- Result
- Fail
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 055-85-01212
- Test gauge calibration is more than a year old.
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
5480 Pine Knoll Rd
Owner: Danner Holdings LLC
Parcel 055-85-01212