← Backflow review queue
Backflow assembly test · 6194 Meadow Lark Dr
ApprovedFiled Aug 11, 2026 by Parker Fairley, Patriot Plumbing & Backflow · paper form read in and confirmed by staff
Report
- Date of service
- Aug 11, 2026
- Assembly type
- RP
- Serial number
- B959711
- Size
- 3/4
- Test gauge serial
- G-4172
- Gauge calibration date
- Mar 21, 2026
- Check valve 1
- 8.2 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.8 psid
- Relief valve opened at
- 3.9 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 053-22-01300
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
6194 Meadow Lark Dr
Owner: Quinn Brandt
Parcel 053-22-01300