← Backflow review queue
Backflow assembly test · Corner Bakery
ApprovedFiled Sep 14, 2026 by Avery Wexler, Northstar Backflow Testing · paper form read in and confirmed by staff
Report
- Date of service
- Sep 14, 2026
- Assembly type
- RP
- Serial number
- Z344015
- Size
- 1 1/2
- Test gauge serial
- G-7445
- Gauge calibration date
- Apr 19, 2026
- Check valve 1
- 4.9 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.5 psid
- Relief valve opened at
- 2.4 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 041-56-01339
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by Auto-approved (no flags). The property's next due date is set and the owner gets a receipt.
Property
7181 Orchard Way
Owner: Wexler Holdings LLC
Parcel 041-56-01339