← Backflow review queue
Backflow assembly test · Hilltop Medical Offices
ApprovedFiled Aug 14, 2025 by Parker Ashby, Valley Backflow Testing · paper form read in and confirmed by staff
Report
- Date of service
- Aug 14, 2025
- Assembly type
- RP
- Serial number
- B850804
- Size
- 1 1/2
- Test gauge serial
- G-9376
- Gauge calibration date
- Aug 11, 2024
- Check valve 1
- 0.5 psid
- Check valve 1 closed tight
- No
- Check valve 2
- 4 psid
- Relief valve opened at
- 3 psid
- Result
- Fail
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 041-11-01088
- Test gauge calibration is more than a year old.
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Approved by Auto-approved (no flags). The property's next due date is set and the owner gets a receipt.
Property
8300 Cedar Hollow Way
Owner: Ashby Holdings LLC
Parcel 041-11-01088