← Stormwater review queue
Stormwater facility inspection · Golden Animal Hospital
ApprovedFiled Jul 29, 2026 by Drew Fairley, Lakeside Engineering · filed from phone
Report
- Date of service
- Jul 29, 2026
- Facility type
- Dry pond
- Sediment accumulation
- 21 % of capacity
- Inlet and outlet clear
- Yes
- Erosion or embankment damage
- No
- Vegetation maintained
- Yes
- Functioning as designed
- Yes
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for professional engineer
- All required fields present
- Address matches parcel 001-62-01026
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
9721 Pine Knoll Ln
Owner: Harlow Holdings LLC
Parcel 001-62-01026