← Backflow review queue
Backflow assembly test · Two Rivers Dental
ApprovedFiled Mar 24, 2023 by Avery Harlow, Valley Backflow Testing · filed from phone
Report
- Date of service
- Mar 24, 2023
- Assembly type
- DC
- Serial number
- A130114
- Size
- 1 1/2
- Test gauge serial
- G-9670
- Gauge calibration date
- Dec 9, 2021
- Check valve 1
- 0 psid
- Check valve 1 closed tight
- No
- Check valve 2
- 2.8 psid
- Result
- Fail
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 025-92-01274
- Test gauge calibration is more than a year old.
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
9200 Hickory Trl
Owner: Fairley Holdings LLC
Parcel 025-92-01274