← Backflow review queue
Backflow assembly test · 9075 Laurel Dr
ApprovedFiled Mar 30, 2024 by Sam Nguyen, Clearwater Backflow Testing · paper form read in and confirmed by staff
Report
- Date of service
- Mar 30, 2024
- Assembly type
- RP
- Serial number
- W601489
- Size
- 3/4
- Test gauge serial
- G-9046
- Gauge calibration date
- Oct 21, 2023
- Check valve 1
- 3 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.2 psid
- Relief valve opened at
- 3.4 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 025-25-01309
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
9075 Laurel Dr
Owner: Taylor Stroud
Parcel 025-25-01309