← Backflow review queue
Backflow assembly test · 9272 Orchard Way
ApprovedFiled Sep 12, 2026 by Logan Benton, Patriot Plumbing & Backflow · filed from phone
Report
- Date of service
- Sep 12, 2026
- Assembly type
- RP
- Serial number
- K969157
- Size
- 3/4
- Test gauge serial
- G-5746
- Gauge calibration date
- Jun 1, 2026
- Check valve 1
- 4.5 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3.9 psid
- Relief valve opened at
- 3.2 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 013-85-01026
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
9272 Orchard Way
Owner: Rowan Hollins
Parcel 013-85-01026