← Backflow review queue
Backflow assembly test · 7065 Cedar Hollow Trl
ApprovedFiled Jul 30, 2024 by Hayden Stroud, Keystone Backflow Testing · filed from phone
Report
- Date of service
- Jul 30, 2024
- Assembly type
- PVB
- Serial number
- W708897
- Size
- 1
- Test gauge serial
- G-3955
- Gauge calibration date
- Mar 24, 2024
- Check valve 1
- 3.9 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.7 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 005-93-01291
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
7065 Cedar Hollow Trl
Owner: Cameron Hollins
Parcel 005-93-01291